2 spray coins, 6 spray elements; per project* (indicative)
Operation
handwheel
Wet zone
to be determined* (indicative)
Material and colour
Construction
Stainless steel 316, powder-coated; welded to EN 1090-2, EXC2
Finish
Powder coating in colour bands per tube section (bend or straight); changes at the seams, perpendicular to the tube. Feet in one colour
Colour
RAL Classic of your choice per colour band. Shown: RAL 3022, 1015, 1016 and 9010 (Merwestein: colour bands in NCS)
Colour band layout
example based on photos of Merwestein; to be defined per project* (indicative)
Installation
Anchoring
Cast-in anchor, 4× M16, to be cast in with the concrete* (indicative)
Foundation
Concrete slab or pad footing as specified by the structural engineer; anchor level and flush with the finished floor
Fixing
Base plate with 4 nuts, covered with caps in the base colour
Fixings in 1.4529
on request* (indicative)
Safety and maintenance
Daily maintenance
Visual check; indoors, rinse with mains water
Weekly maintenance
Clean the spray nozzle, remove limescale and dirt
Six-monthly maintenance
Indoors: NEN 9200 inspection of stainless steel and fixings
Winter maintenance
Outdoors: drain the supply and blow it dry* (indicative)
Standard (indoors)
NEN 9200:2025; the element is in zone A (splash zone). Stainless steel 316 is permitted provided it is inspectable and traceable, checked weekly, inspected every six months and regularly rinsed with mains water
Elements with wet zone
For these elements we show the full specifications and the wet zone.